TRADESCRAFT

JSA and SWMS software

Prepare a country-aware safety plan, capture pre-start evidence, and retain the version and acknowledgement trail.

Prepare JSA and SWMS records with work steps, hazards, initial and residual risk, and controls. Keep worker acknowledgements and pre-start evidence with the job, and request fresh acknowledgement when a material plan change creates a new version.

A live safety plan on every job

Each JSA or SWMS carries a status, links to its job and site, and captures worker sign-off against the exact revision - bump the version and the prior sign-offs are flagged for re-sign.

A Tradescraft JSA marked active, linked to its job and site, with the worker sign-off panel

Sign-off that sticks to the version

An active plan the crew can read and sign on to, with sign-off captured wet, digital or verbal and stamped against the revision each worker saw. Change the document and the version bumps, so the old sign-offs are flagged as needing a re-sign before work continues.

Country-aware safety paperwork

  • Build a JSA or SWMS with work steps, hazards, initial and residual risk, and controls for the actual site and work.
  • A 5×5 risk matrix, with Australia's high-risk construction work categories labelled only for Australian businesses.
  • A trade-specific hazard library with default controls, so documents are quick and consistent.

Sign-off that sticks

  • Manual wet, digital or verbal sign-off records the plan version acknowledged.
  • Material plan changes bump the version and flag earlier sign-offs for re-signing.

A retained evidence trail

  • Review events and the re-sign trail stay with the current plan record.
  • See the version number each worker acknowledged, when and how. Clock-in evidence is read-only and prevents the plan being hard-deleted.

Common questions

What standard are the safety documents based on?
Australian accounts use JSA/SWMS and high-risk construction work framing. Review the plan against the actual work, site and applicable requirements; completing a form alone does not establish compliance.
What happens if a SWMS changes after workers have signed?
A material content change bumps the plan version and flags earlier manual sign-offs as stale. When the plan is part of the clock-on gate, the worker completes the current pre-start requirements before time starts.
Do I have to build every document from scratch?
No. A trade-specific hazard library with default controls is built in, so you start from a sensible template and adjust it for the job rather than typing every hazard out each time.
Can workers sign off on site?
Yes. The browser field view supports the full pre-start check. Manual wet, digital or verbal sign-offs record the plan version; clock-in evidence is stored separately as a read-only record.

Works with

See whether Tradescraft fits your crew.